Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Super-sniffer aeroplane finds oil fields’ hidden emissions

    Great Grants Need Far Away Deadlines

    The science behind why some auroras have such stunning wave patterns

    Facebook X (Twitter) Instagram
    Facebook X (Twitter) YouTube LinkedIn
    Naija Global News |
    Sunday, February 8
    • Business
    • Health
    • Politics
    • Science
    • Sports
    • Education
    • Social Issues
    • Technology
    • More
      • Crime & Justice
      • Environment
      • Entertainment
    Naija Global News |
    You are at:Home»Business»AI a game changer for power demand | Insights
    Business

    AI a game changer for power demand | Insights

    onlyplanz_80y6mtBy onlyplanz_80y6mtOctober 8, 2025004 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    Nuclear power plant
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Renewable energy sources such as wind and solar are emissions-free, like nuclear, but intermittent, which suggests they must be paired with storage or backup capacity. Coal and natural gas-fired power plants have higher capacity factors yet generate greenhouse-gas emissions, making them an unlikely choice for hyperscalers that prioritize environmental stewardship.

    Capacity factor, a measure of efficiency, is the ratio of power produced by a source over the total amount it could have produced if running at full strength over a certain period. Nuclear has the highest capacity factor by far of any power source at 90%, followed by coal and combined-cycle gas (60%), wind (35%) and solar (25%). Yet nuclear also costs the most, at $12,500 a kilowatt, well ahead of coal ($5,000), combined-cycle gas ($2,500) and wind and solar ($1,500 each).

    New generation capacity of 131-310 GW may be needed to supply the 345-815 terawatt-hours of power required to support US growth in AI computing by 2030. This would equate to an increase of 11-26% from 2023. It assumes a capacity factor of only 30%, in line with wind and solar, since any new baseload capacity may have to be outfitted with costly and unproven carbon-capture technology, according to Environmental Protection Agency regulations, and new nuclear plants may take much longer to build.

    Our analysis assumes all AI power needs are met with new generation, rather than increasing output from existing plants. It also excludes the cost of backup, data-center or transmission infrastructure, as well as any fuel efficiencies obtained via advances in chip technology.

    Contract premiums of $15-$25 Per MWh

    Data centers are willing to pay a premium for that power, leaving generators such as Constellation Energy and Vistra poised for major Ebitda gains from nuclear power deals set at above-market prices. Constellation’s January VPPA with the US General Services Administration – $840 million for 1 million MWh annually for 10 years – implies a contract price of mid-$80/MWh.

    This equates to $15-$25 above market, assuming wholesale power in the low-to-mid $50s and capacity in the low-to-mid $10s. As Figure 8 shows, if each company contracts half of its nuclear capacity at the midpoint $20/MWh premium, Constellation could get a $1.8 billion annual Ebitda boost and Vistra $500 million.

    These premiums may prove sustainable, underpinned by data-center demand and limited new nuclear supply. Constellation is by far the largest US merchant nuclear owner, with capacity of more than 22,000 megawatts, followed by Vistra (6,500), Public Service Enterprise Group (3,800), NextEra (2,300), Talen (2,200) and Dominion (2,000).

    Recent nuclear data-center deals have shifted toward front-of-the-meter (FTM) virtual power-purchase agreements (VPPAs) that draw from the grid, avoiding regulatory hurdles tied to off-grid behind-the-meter (BTM) setups that supply power directly. Constellation’s VPPAs with Microsoft (835 MW from the Crane plant restarting in 2027) and Meta (Clinton, after Illinois subsidies expire in 2027) illustrate this trend.

    Yet BTM PPAs may offer key advantages to data centers by providing greater load control and operational flexibility. Since the generation is located on-site, electricity can flow directly to the data center, bypassing the network. New nuclear capacity developed under this model could alleviate grid congestion and help prevent cost-shifting to non-data center users. Also, avoiding the interconnection queue may reduce capital costs and deployment timelines compared with front-of-the-meter projects.

    PSEG estimates incremental transmission costs can reach $7 a megawatt-hour for FTM solutions, costs that behind-the-meter deployments would largely avoid. Yet BTM connections require FERC approval.

    PPA opportunities could emerge for Constellation’s other Illinois-subsidized plants – Quad Cities, Byron, Dresden and Braidwood – totaling 8 GW. In New Jersey, Salem and Hope Creek lost their subsidies in May and may be candidates, with PSEG owning 2.5 GW and Constellation 1 GW. Talen Energy and Amazon Web Services recently expanded their 960-MW Susquehanna agreement in Pennsylvania into a 1.9 GW VPPA, including a 300 MW BTM deal.

    This analysis comes from Bloomberg Intelligence’s “Nuclear Power 2026 Outlook”. Terminal subscribers can find the full version of this analysis on BI . 

    changer demand Game insights Power
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleMarc Maron is the rare comedian who shows us how it should be done | Comedy
    Next Article How to fix France’s deepening political crisis? | Politics News
    onlyplanz_80y6mt
    • Website

    Related Posts

    Rape allegation against ex-Barclays CEO Jes Staley was raised in US Epstein investigation | Jeffrey Epstein

    February 8, 2026

    The Russian economy is finally stagnating. What does it mean for the war – and for Putin? | Russia

    February 8, 2026

    TikTok could be forced to change app’s ‘addictive design’ by European Commission | TikTok

    February 7, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    Watch Lady Gaga’s Perform ‘Vanish Into You’ on ‘Colbert’

    September 9, 20251 Views

    Advertisers flock to Fox seeking an ‘audience of one’ — Donald Trump

    July 13, 20251 Views

    A Setback for Maine’s Free Community College Program

    June 19, 20251 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews

    At Chile’s Vera Rubin Observatory, Earth’s Largest Camera Surveys the Sky

    By onlyplanz_80y6mtJune 19, 2025

    SpaceX Starship Explodes Before Test Fire

    By onlyplanz_80y6mtJune 19, 2025

    How the L.A. Port got hit by Trump’s Tariffs

    By onlyplanz_80y6mtJune 19, 2025

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Watch Lady Gaga’s Perform ‘Vanish Into You’ on ‘Colbert’

    September 9, 20251 Views

    Advertisers flock to Fox seeking an ‘audience of one’ — Donald Trump

    July 13, 20251 Views

    A Setback for Maine’s Free Community College Program

    June 19, 20251 Views
    Our Picks

    Super-sniffer aeroplane finds oil fields’ hidden emissions

    Great Grants Need Far Away Deadlines

    The science behind why some auroras have such stunning wave patterns

    Recent Posts
    • Super-sniffer aeroplane finds oil fields’ hidden emissions
    • Great Grants Need Far Away Deadlines
    • The science behind why some auroras have such stunning wave patterns
    • In your face: Close-up Photographer of the Year Awards 2026 – in pictures
    • The sneeze secret: how much should you worry about this explosive reflex? | Health
    © 2026 naijaglobalnews. Designed by Pro.
    • About Us
    • Disclaimer
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.